PR-48 INDOPACO, 2024 (Wind Farm + Dot Changing Apparent Direction)

The lack of consistent rows in the first field could be a sign that it was under construction at the time. If so it would be very hard to locate. I'm going to check again looking specifically for one with consistent rows of 3+ turbines next to another and checking the dates as can be found.
 
Back
Top